IEC 60076-6 FREE DOWNLOAD

In the scope of this paper, using this data, an algorithm to ascertain detailed parameters of the reactor, like inductance and resistance, are developed and presented. In case of a faulty reactor, it is possible to see how the reactor’s response to the impulse changes over time. Login Password Password forgotten Create your account Members may download free of charge all publications including most recent ones Non Members may download free of charge publications over three years old and purchase all publications. Using the software introduced in this paper, the behaviour of faulty reactors can be observed live during the turn-to-turn overvoltage test. Management guidelines for outsourcing overhead transmission lines technical expertise.

Uploader: Nigar
Date Added: 13 October 2008
File Size: 54.16 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 69754
Price: Free* [*Free Regsitration Required]

These recorded data is then compared and the test result is determined.

GSO IEC – Standards Store – GCC Standardization Organization

Management guidelines for outsourcing overhead transmission lines technical expertise. Using the software introduced in this paper, the behaviour of faulty reactors iec 60076-6 be observed live during the turn-to-turn overvoltage test.

Part of these tests is a routine test using lightning impulse voltages.

Costs of electric 60067-6, allocation methods, and residential rate trends. In the scope iec 60076-6 this paper, using this data, an algorithm to ascertain detailed parameters of the reactor, like inductance and resistance, are developed and presented.

  VANESSA ARBUTHNOTT WALLPAPER

Iec 60076-6 further research, finding the exact cause and reason of damage for faulty reactors may be possible without conducting additional tests.

Running on a modern computer, the software is able to capture and evaluate data of the running test in real-time and show, if the behaviour of the reactor changes during the test. By using a PC-oscilloscope, the measurement data can be acquired onto a personal computer for further analysis, allowing detailed real-time insight into the reactor under test.

Search results | IEC Webstore

Today all non-high-frequency reactors rated 1 kvar single phase or 5 kvar three phase and above are tested according to IEC Recording these waveforms to date is done with oscilloscopes, triggered manually, or by the generator, to record the first and the last oscillogram.

Iec 60076-6 drytype reactors, having a rated voltage of Um less or equal to 35 kV, the standard allows an alternative turn-to-turn overvoltage test, which is described in Appendix Iec 60076-6 of the document. The algorithm is used as a basis for a demonstration software. For any questions in connection with the on-line library, contact: The basic procedure of the test is to apply a minimum of voltage pulses with either 1,33 60076-66 1 times the peak value iec 60076-6 the rated voltage for outdoor and indoor reactors, respectively, which need to be applied within one minute.

In order to pass the test, the frequency of the waveshape of the reactor’s response to the first impulse or an reference impulse with lower voltage must not differ from the response to the last of the impulses. Substation earthing system design optimisation through iec 60076-6 application of quantified risk analysis.

  MP5K WALLPAPERS

Environmental issues of high voltage transmission lines in urban and rural areas.

Login Password Password forgotten Create your account Members may download free of charge all publications including most idc ones Non Irc may download free of charge publications over three years old and iec 60076-6 all publications.

Data of the measurement are analysed in real-time and shown graphically and in text on screen for the test operator to monitor. In case of a faulty reactor, it is possible to see how the reactor’s response to the impulse changes over time.

Search results for “”

Design, deployment and maintenance of optical cables associated to overhead HV transmission lines. To conduct these tests, a special impulse generator consisting of a DC source, a charging capacitor and a spark gap is used as generator. Automation of the measurement and evaluation of turn-to-turn overvoltage tests on dry-type high voltage reactors according iec 60076-6 IEC Appendix E.

Related Posts